| 1. |
|
Application
Engineering |
| |
|
|
+ |
Site Survey |
|
+ |
Requirement Specification |
|
|
|
+
+
+
+
+
+
+ |
Controller Selection
I/O Module Estimation
Communication Network Selection
Overall Network Configuration
Interface with third Party Devices
Reporting Software
Operator Training |
|
+ |
Estimation of |
|
|
|
+
+
+
+ |
Equipment required in control
room like Cabinets, Consoles etc.
Erection materials based on instrument
location drawings,
Structural Steel pipes for instruments
supports, cables ducts, trays
etc,
Type and quantity of cables. |
|
+ |
Proposal Documentation |
|
|
|
+
+
+
+
+
+
+
+ |
Overall Scope
Configuration Diagram
Major Equipment Specification
Proposed Equipment Layout
Major BOM
Scope of Services
Applicable Standards
Catalogue / Data Sheets |
|
| 2. |
|
Detailed
Design Engineering |
| |
|
| |
+ |
Control Automation
/ Electrical |
|
|
|
+
+
+
+
+
+
+
+
+
+
+
+ |
General & Internal Arrangement
Wiring Diagram
Control Scheme
BOM with Specification
Control Room Layout
Cable Interconnection Diagram
Power Consumption Charts
Consumable List
Assembly Procedure
SAT Procedure
FAT Procedure
O & M Documentation |
|
+ |
Instrumentation |
| |
|
|
+
+
+
+
+
+ |
Preparation
of instrument list from P&I
diagrams
Detailed specifications of various
instruments based on the P&I
diagrams and process details
Preparation of instrument hook-up
drawings
Preparation of detailed BOM
for field work like pipes, fittings,
tubes, cables, etc.
Preparation of interconnection
diagrams between field and control
room instruments/systems
Preparation of cable schedule
for interconnection between
various cabinets and field instruments
Design of shut down and interlock
systems for the Plant, based
on details furnished by the
Process Engineers
Duct and cable tray routing
|
| |
+ |
O & M Documentation
|
|
| 3. |
|
Control
Software / SCADA Development |
| |
|
| |
+
+
+
+
+
+ |
Preparation of I/O Lists , Ladder
Logic Diagrams
Development of prototype
Program Development
SCADA Screens
Simulation testing
Integration testing & Configuration |
|
| 4. |
|
Process
Optimization Services |
|
|
| |
+
+
+
+
+ |
Control Audit & Reporting
Process Optimization Measures
Retrofits
Implementation & Testing
Reporting and Handling Over |
|
| 5. |
|
Field Services
Technical Manpower Deputation for the
following activities |
|
|
| |
+
+
+
+
+
+ |
Commissioning
Preventive Maintenance
Breakdown Resolutions
Calibrations
Software Upgrades
Retrofits
|
|
| 6. |
|
Training Solutions
Onsite or Classroom training facilities
available for |
|
|
| |
+
+
+
+ |
PLC
Drives
HMI
System Specific |
|
| |
|
|